DRINKING WATER & WASTEWATER PROFESSIONALS
Bureau of Occupational Licenses
1109 Main Street, Suite 220
Boise, ID 83702-5642
Board Meeting Minutes of 10/1/2008
BOARD MEMBERS PRESENT: William A Thompson - Chair
Robert F. Hansen
Victor Villegas
John Keady
Larry Annen
Barry Burnell
BOARD MEMBERS ABSENT: Richard Dees
BUREAU STAFF: Tana Cory, Bureau Chief
Budd Hetrick, Deputy Bureau Chief
Dawn Hall, Deputy Bureau Chief
Roger Hales, Administrative Attorney
Mary Miles, Technical Records Specialist I
OTHERS PRESENT: Lynn Tominaga, Idaho Water Policy Group, Inc.
Meeting was called to order at 9:00 AM MDT by
William A Thompson.
INTRODUCTIONS
Ms. Cory introduced two new Board members: Larry Annen and John Keady.
APPROVAL OF MINUTES
A motion was made by Mr. Hansen to approve the July 2, 2008 minutes as written. Seconded by, Mr. Villegas, motion carried.
FINANCIAL REPORT
Ms. Hall gave the financial report. This report is available on the website. As of 09/30/2008, the Board has $45,594.09 in expenditures with a cash balance of $421,934.68. It was noted that expenditures will increase with online exams. Click on “Board Detail Financials” on the website to access a detailed financial report.
https://secure.ibol.idaho.gov/eibolpublic/tmpfinbudget.aspx?Bureau=wwp
FY2009 CONTRACT RENEWAL
Ms. Hall presented the FY2009 Contract Renewal to the Board.
A motion was made by Mr. Hansen to approve and authorize the Board chair to sign the FY2009 Contract Renewal. Seconded by Mr. Villegas, motion carried.
CONTINUING EDUCATION
A discussion was held regarding the Backflow
Assembly Testers continuing education requirement of obtaining an eight hour BAT
Refresher course every two years. Mr. Hetrick outlined the procedure when an
operator has failed to meet the requirement. Mr. Hetrick explained to the Board
that there are 35 Consent Orders for BATs pending. The Board directed the Bureau
to proceed with the Consent Order procedure.
The Board discussed CE audits and determined that 10% of licensees will be audited annually. An audit will be sent out in March of 2009 for the Board to review at their May 13, 2009 Board meeting.
INVESTIGATIVE REPORT
Mr. Hetrick presented the investigative report.
|
Fiscal Year 2008 |
|
|
Total Complaints received |
45 |
|
(Including 43 CE audit files) |
|
|
Status: |
|
|
Closed by Board action |
1 |
|
Pending IBOL disciplinary action |
19 |
|
Remaining under investigation |
21 |
|
Awaiting board determination |
4 |
|
|
|
|
Fiscal Year 2007 |
|
|
Total Complaints received |
42 |
|
(Including 39 CE audit files) |
|
|
Status: |
|
|
Closed by Board action |
25 |
|
Closed following disciplinary action |
3 |
|
Pending Office of the Attorney General |
1 |
|
Pending IBOL disciplinary action |
2 |
|
Remaining under investigation |
4 |
|
Awaiting Board determination |
7 |
I-WWP-2007-6 R submitted proof of only .3 CE units for license renewal. A letter was sent to R requesting the additional CEU's. Documentation was subsequently submitted confirming compliance with the CE requirement. Record confirms the license is now cancelled. IBOL recommends the Board authorize closure.
A motion was made by Mr. Burnell to close the case. Seconded by Mr. Hansen, motion carried.
I-WWP-2007-13 C alleged R did not meet the CE requirement. Documentation submitted showed CE was obtained outside the audit period. Documentation was subsequently received confirming compliance with the CE requirement. IBOL recommends the Board authorize closure.
A motion was made by Mr. Keady to close the case. Seconded by Mr. Villegas, motion carried.
I-WWP-2007-17 C alleged R did not complete the 6 hours of required CE. Docs show only .3 hours for period. Documentation was subsequently provided confirming compliance with the requirement. IBOL recommends the Board authorize closure.
A motion was made by Mr. Burnell to close the case. Seconded by Mr. Villegas, motion carried.
I-WWP-2007-18 C alleged R was required to obtain 6 hours of CE. Docs show all CE was obtained outside the audit period. Documentation was subsequently received confirming compliance with the requirement. IBOL recommends the Board authorize closure.
A motion was made by Mr. Annen to close the case. Seconded by Mr. Burnell, motion carried.
I-WWP-2007-21 C alleged R did not obtain 6 hours of CE. Docs show CE was obtained 5 days outside the period. Sent cert letter requesting documentation for CE taken within the audit period. R submitted documentation confirming active military duty during the period in question. As per Idaho law active military personnel are exempt from renewal and CEU requirements. IBOL recommends the Board authorize closure.
A motion was made by Mr. Keady to close the case. Seconded by Mr. Hansen, motion carried.
I-WWP-2007-22 C alleged R was required to obtain 6 hours of CE, and the courses submitted were not relevant to drinking water. Sent letter outlining the need for CE relevant to drinking water. Documentation was received to confirm compliance with the CE requirement. IBOL recommends the Board authorize closure.
A motion was made by Mr. Burnell to close the case. Seconded by Mr. Hansen, motion carried.
I-WWP-2007-25 C alleged R did not complete the 6 hours of required CE. Docs show 2 classes were not approved for WW license category. R lacks .4 CEUs for period. Sent letter requesting CE for wastewater license for 2 years. R submitted documentation of 37 approved CEU credits for the audit period, clearly meeting both the annual and carry-over rule. IBOL recommends the Board authorize closure.
A motion was made by Mr. Hansen to close the case. Seconded by Mr. Burnell, motion carried.
I-WWP-2008-1 R did not complete the 6 hours of required CE. Washington Sewer Maintenance School does not specify CE hours. Backflow Assembly Tester Refresher Course is not relevant to wastewater, and the 30th Annual Western OR Regional Water Environmental meeting is not relevant to wastewater, and the 2007 Evergreen Rural Water of WA Annual Conference is not relevant to wastewater. Record shows license cancelled. IBOL recommends the Board authorize closure, as CE will be required upon reinstatement.
A motion was made by Mr. Burnell to close the case. Seconded by Mr. Hansen, motion carried.
I-WWP-2008-4 Licensee has a deficiency of 6 hours of regular CE for this audit period. R submitted a letter alleging to being told that no CEs were required for very small system operators and that no classes had ever been taken. Record shows the license has cancelled. IBOL recommends the Board authorize closure as CE documentation will be required upon any reinstatement.
A motion was made by Mr. Burnell to close the case. Seconded by Mr. Keady, motion carried.
I-WWP-2008-7 The audit shows that documentation of 8 hours of approved CE were submitted that were obtained outside this period. R submitted documentation that a scheduled class within the time period had been cancelled unexpectedly and R completed the next available class. IBOL recommends the Board authorize closure with an advisory letter regarding the CE requirements.
A motion was made by Mr. Keady to close the case and send an advisory letter. Seconded by Mr. Hansen, motion carried.
I-WWP-2008-15 Licensee has a deficiency of 8 hours of BAT refresher CE for this audit period. Review revealed that incorrect dates had been audited and the documentation submitted confirmed compliance with the requirement. IBOL recommends the Board authorize closure.
A motion was made by Mr. Hansen to close the case. Seconded by Mr. Burnell, motion carried.
Break at 10:40 A.M.
Called to order at 10:55 A.M.
PUBLIC COMMENTS
The Board will schedule a conference call after the hearing to discuss the comments and determine what action will be taken on the proposed rules.
CORRESPONDENCE
The Board discussed the correspondence received from Stephen Boorman, City of Bonners Ferry regarding application deadlines.
A motion was made by Mr. Keady for IBOL to respond to Mr. Boorman’s letter stating the rule regarding application deadlines and that upon receipt of the operator applications, they will be reviewed at the next scheduled meeting for the next available exam. Seconded by Mr. Hansen, motion carried.
A motion was made by Mr. Villegas to break for lunch and return at 1:00 pm. Seconded by Mr. Hansen, motion carried
The meeting reconvened at 1:00 pm.
2009 EXAM DATES
|
Application Deadline |
Board Meeting |
Exam Date |
Re-Exam Application Deadline |
|
January 5, 2009 |
February 11, 2009 |
March 18, 2009 |
January 26, 2009 |
|
April 6, 2009 |
May 13, 2009 |
June 17, 2009 |
April 27, 2009 |
|
July 6, 2009 |
August 5, 2009 |
September 16, 2009 |
July 27, 2009 |
|
October 5, 2009 |
November 4, 2009 |
December 16, 2009 |
October 26, 2009 |
|
January 4, 2010 |
February 3, 2010 |
March 17, 2010 |
January 25, 2010 |
A motion was made by Mr. Keady to approve the proposed application deadlines, board meetings, and exam dates for 2009. Seconded by Mr. Hansen, motion carried.
CONTINUING EDUCATION
Mr. Hetrick presented to the Board a letter received regarding continuing education. The correspondence is in referenc to case number I-WWP-2007-4.
The Board discussed the issue and directed the Bureau to continue the consent order process.
ABC SURVEY
The ABC survey regarding experience has been put on the agenda for the next scheduled meeting.
PACIFIC NORTHWEST SECTION OF THE AMERICAN WATER WORKS ASSOCIATION
The PNWS-AWWA has formed a certification committee and has requested a representative from the Idaho, Oregon, and Washington certification boards to sit on this committee. The function of the committee will be to try and develop uniformity with licensing and certification between states in the water industry. Mr. Hansen and Mr. Burnell will contact Marla Carter, the Public Information and Education Manager for the City of Everett Public Works.
CONTRACT OPERATORS
Discussion regarding contract operators and licensure requirements will be put on the February 2009 agenda.
EXECUTIVE SESSION
A motion was made by Mr. Burnell to go into executive session to review the Backflow Assembly Tester exams and review applications for licensure and exam that are exempt from public disclosure per Idaho Code 67-2345 (1) (d). Seconded by Mr. Villegas. Votes were: Mr. Burnell, aye; Mr. Hansen, aye; Mr. Villegas, aye; Mr. Keady, aye; and Mr. Annen, aye. Motion carried.
A motion was made by Mr. Hansen to come out of executive session. Seconded by Mr. Villegas. Votes were: Mr. Hansen, aye; Mr. Villegas, aye; Mr. Burnell, aye; Mr. Keady, aye; and Mr. Annen, aye. Motion carried.
The Board made the determination that the Backflow Assembly Tester exam questions were relevant to the profession, but they made a few notations for ABC to consider.
A motion was made by Mr. Hansen to approve 158 applications for licensure and 33 applications for examination; to deny seven applications and to put one application in pending. Seconded by Mr. Keady, motion carried.
A motion was made by Mr. Hansen to approve 173 continuing education applications. Seconded by Mr. Burnell, motion carried.
CE COURSES
APPROVED
360WATER, INC
CLOSED CONDUIT HYDRAULICS - 0.1 - DW-WW
OXYGEN MEASUREMENTS - 0.1 - WW
PRETREATMENT REGULATIONS - 0.1 - WW
SOLIDS ANALYSIS - 0.1 - WW
WATER QUALITY MANAGEMENT - 0.1 - WW
LEADERSHIP AND HOW TO AFFECT CHANGE IN PUBLIC
ORGANIZATIONS - 0.1 - DW-WW
WASTEWATER 1 OPERATOR STUDY GUIDE - 0.1 - WW
ULTRAVIOLET DISINFECTION - 0.1 - DW-WW
WASTEWATER TREATMENT THEORY CLASS 1 - 0.1 - WW
WASTEWATER TREATMENT THEORY CLASS 2 - 0.1 - WW
WASTEWATER TREATMENT THEORY CLASS 3 - 0.1 - WW
BIOCHEMICAL OXYGEN DEMAND AND CARBONACEOUS
BIOCHEMICAL OXYGEN - 0.1 - WW
INTRODUCTORY TO THE DEVELOPMENT OF A QUALITY ASSURANCE/QUALITY - 0.1 - DW-WW
HOW TO PERFORM FECAL COLIFORM ANALYTICAL TEST FOR WASTEWATER TREATMENT - 0.1 - WW
MICROSCOPIC EXAMINATION OF ACTIVATED SLUDGE - 0.1 - WW
MATH CLASS 1 - 0.1 - DW-WW
MATH CLASS 2 - 0.1 - WW
MATH CLASS 2 - ACTIVATED SLUDGE PLANT #1 - 0.1 - WW
MATH CLASS 3 - ACTIVATED SLUDGE PLANT #2 - 0.1 - WW
MATH CLASS 4 - ACTIVATED SLUDGE PLANT #2 - 0.1 - WW
LOCK OUT TAG OUT - THE CONTROL OF HAZARDOUS ENERGY - 0.1 - DW-WW
TERMS AND EQUATIONS FOR MEMBRANE OPERATIONS - 0.1 - DW
INTRODUCTION TO MEMBRANE OPERATIONS FOR SMALL UTILITIES - 0.1 - DW
MEMBRANE UNIT OPERATORS - 0.1 - DW
SYSTEM DESIGN AND FLOW CONFIGURATIONS FOR MEMBRANE OPERATIONS - 0.1 - DW
UNITED STATES WATER AND WASTEWATER UTILITY INDUSTRY - 0.1 - DW-WW
U.S. WTR & WWT UTILITY INDUSTRY - FEDERAL, STATE, LOCAL CONTROL - 0.1 - DW-WW
BASIC SAFETY FUNDAMENTALS FOR THE WATER & DISTRIBUTION SYS OPERATOR - 0.1 - DW
CROSS CONNECTION CONTROL - 0.1 - DW
INTRODUCTION TO DISTRIBUTION SYSTEM PIPING AND VALVING - 0.1 - DW
DRINKING WATER DISINFECTION - 0.1 - DW
DRINKING WATER ION EXCHANGE SOFTENING - 0.1 - DW
DRINKING WATER PRECIPITATION SOFTENING - 0.1 - DW
FUNDAMENTALS OF COAGULATION AND FLOCCULATION - 0.1 - DW
MEDIA FILTRATION FOR DRINKING WATER - 0.1 - DW
HAZARD COMMUNICATION TRAINING COURSE - 0.1 - DW
HOW TO PERFORM TOTAL COLIFORM ANALYTICAL TEST FOR DRINKING WATER - 0.1 - DW
ACCIDENT INVESTIGATION - 0.1 - DW-WW
BLOOD BORNE PATHOGENS - 0.1 - WW
CONFINED SPACE ENTRY - 0.1 - DW-WW
TRICKLING FILTERS - 0.1 - WW
UNITED STATES WATER & WASTEWATER UTILITY INDUSTRY - FEDERAL, STATE - 0.1 - DW-WW
PROBLEMS CAUSED BY ROOTS IN SEWERS - 0.1 - WW
ACTIVATED SLUDGE - 0.1 - WW
BOISE CITY PUBLIC WORKS
WASTEWATER JEOPARDY - 0.3 - WW
INTRODUCTION TO THE WASTEWATER LABORATORY - 0.2 - WW
BOISE STATE UNIVERSITY
BASICS OF LAGOONS - 0.6 - WW
CEU PLAN
DECHLORINATION - GAS APPLICATION AND USAGE - 0.3 - DW-WW
HAVE YOU SEEN THE LIGHT? INTRODUCTION TO UV
TECHNOLOGIES - 0.1 - DW-WW
WATER TREATMENT TECHNIQUES - COMPLETE COURSE - 10 - DW
WATER TREATMENT TECHNIQUES: FILTRATION - 0.2 - DW
WATER TREATMENT TECHNIQUES: SETTLING AND
CLARIFICATION - 0.2 - DW
WATER TREATMENT TECHNIQUES: DISTILLATION - 0.2 - DW
WATER TREATMENT TECHNIQUES: ION EXCHANGE - 0.2 - DW
WATER TREATMENT TECHNIQUES: MEMBRANE SEPARATION - 0.2 - DW
TOXIC & HAZARDOUS MATERIALS HANDLING PROCEDURES - 0.4 - DW-WW
UV DISINFECTION - SIZING A UV SYSTEM USING BIOASSAY DATA AND FACTORS AFFECTING OPERATIONS - 0.1 - DW-WW
HISTORY OF ULTRAVIOLET DISINFECTION - 0.1 - DW-WW
LEAD AND COPPER RULE - 0.1 - DW
ARSENIC - 0.1 - DW
OXIDATION REDUCTION POTENTIAL (ORP) INSTRUMENTATION AND MEASUREMENT - 0.1 - DW-WW
PH INSTRUMENTATION AND MEASUREMENT - 0.1 - DW-WW
BECOMING A FIRST CLASS SUPERVISOR: COMPLETE COURSE - 0.4 - DW-WW
BECOMING A FIRST CLASS SUPERVISOR: TRANSITION FROM CRAFTSMAN TO SUPERVISOR - 0.1 - DW-WW
BECOMING A FIRST CLASS SUPERVISOR: EFFECTING SUPERVISORY COMMUNICATION - 0.1 - DW-WW
BECOMING A FIRST CLASS SUPERVISOR: LEADERSHIP COACHING - 0.1 - DW-WW
BECOMING A FIRST CLASS SUPERVISOR: DELEGATION/MOTIVATION - 0.1 - DW-WW
TREATMENT PLANT MAINTENANCE AND ACCIDENT PREVENTION: COMPLETE COURSE - 0.4 - DW-WW
TREATMENT PLANT MAINTENANCE AND ACCIDENT PREVENTION: OWNERSHIP OF EQUIPMENT - 0.1 - DW-WW
TREATMENT PLANT MAINTENANCE AND ACCIDENT PREVENTION: EQUIPMENT FAILURES AND HAZARDS - 0.1 - DW-WW
TREATMENT PLANT MAINTENANCE AND ACCIDENT PREVENTION: CHECKLISTS MEAN MORE THA A CHECKMARK - 0.1 - DW-WW
TREATMENT PLANT MAINTENANCE AND ACCIDENT PREVENTION: SOLUTIONS CAN BE HEALTHY - 0.1 - DW-WW
PARASITES - PART 2 - 0.2 - DW-WW
INTRODUCTION TO BASIC MICROBIOLOGY AND PARASITES - 0.6 - DW-WW
BASIC MICROBIOLOGY - PART 2 - 0.2 - DW-WW
FILAMENTIOUS BACTERIA INDENTIFICATION & PROCESS CONTROL - 0.1 - WW
INTRODUCTION TO WASTEWATER MICORBIOLOGY & PROCESS CONTROL - 0.1 - WW
COLLECTION SYSTEM: GETTING TO THE ROOT OF THE SEWER PROBLEM - 0.1 - WW
INTODUCTION TO BACKFLOW PREVENTION - 0.1 - DW-WW
WATERS JOURNEY: PART 1 - HIDDEN RIVERS - 0.1 - DW-WW
WATER SHORTAGE, REUSE, AND RESOURCE MANAGEMENT: THE ST. PETERSBURG, FLORIDA EXPERIENCE - 0.1 - DW-WW
WATERS JOURNEY: PART 2 - RIVER RETURNS - 0.1 - DW-WW
CORROSION CONTROL IN WATER AND WASTEWATER - 0.1 - DW-WW
FOG: FATS, OILS, AND GREASE - 0.4 - DW-WW
LABORATORY SAFETY: ELECTRICAL, FIRE, AND RADIATION SAFETY - 0.1 - DW-WW
INDIAN HEALTH SERVICE
IHS WATER SYSTEM OPERATOR TRAINING - DRINKING WATER
RULES UPDATE - 0.1 - DW
IHS WATER SYSTEM OPERATOR TRAINING - TRIBAL OPERATOR CERTIFICATION REQUIREMENTS - 0.05 - DW
IHS WATER SYSTEM OPERATOR TRAINING - SMALL WATER SYSTEM DISINFECTION - 0.05 - DW
IHS WATER SYSTEM OPERATOR TRAINING - CHEMICAL FEED PUMPS - 0.175 - DW
IHS WATER SYSTEM OPERATOR TRAINING - CHLORINE MATH AND CHLORINATIOON DEMONSTRATION - 0.15 - DW
IHS WATER SYSTEM OPERATOR TRAINING - PUMP AND MOTOR MAINTENANCE AND REPAIR - 0.225 - DW
IHS WATER SYSTEM OPERATOR TRAINING - CLASS FIELD TRIP - 0.4 - DW
IHS WATER SYSTEM OPERATOR TRAINING - CROSS CONNECTION AND BACKFLOW PREVENTION - 0.175 - DW
IHS WATER SYSTEM OPERATOR TRAINING - SAFETY: TRENCH, CONFINED SPACES, CHLORINE, AND LOCK-OUT TAG-OUT - 0.175 – DW
INTERMOUNTAIN SECTION OF THE AMERICAN WATER WORKS ASSOCIATION
AWWA - DEFENSIBLE CAPITAL IMPROVEMENT PROGRAM USING
ASSET MANAGEMENT TECHNIQUES - 0.067 - DW-WW
AWWA - MASTER PLANNING PLUS - 0.067 - DW-WW
AWWA - DETECTION AMD MANAGEMENT OF MIB & GEOSMIN PRODUCING ALGA AT QUAL CREEK RESERVOIR - 0.067 - DW
AWWA - IMPLEMENTING AN EFFECTIVE UV ADVANCED OXIDATION PROCESS - 0.067 - DW-WW
AWWA - WHAT YOU NEED TO KNOW WHEN CONSIDERING THE TRANSITION FROM CONVENTIONAL TO MEMBRANE WATER TREATMENT - 0.067 - DW
AWWA - FROM THE RESERVOIR TO YOUR RESIDENCE - A MULTI-BARRIER APPROACH TO PROTECT THE COMMUNITY FROM TASTE AND ODORS - 0.067 - DW
AWWA - THE REACTIVE ART & SCIENCE OF QUENCHING OZONE - 0.067 - DW
AWWA - COAGULATIOON-ASSISTED, HIGH-FLUX PRESURIZED MICROFILTRATION MEMBRANES FOR TOC REMOVAL - 0.067 - DW
AWWA - FINANCIAL PLANNING TO REDUCE THE PAIN OF USER RATE HIKES - 0.067 - DW-WW
AWWA - HOW TO PREPARE A WATER SYSTEM BUDGET - 0.067 - DW-WW
AWWA - COLLECTOR WELL DEVELOPES RIVERBANK FILTRATION WATER SUPPLY ALONG GREEN RIVER - 0.067 - DW
AWWA - MY WATER SYSTEM IS NOT APPROVED! HOW DID THAT HAPPEN? - 0.067 - DW
AWWA - WHAT DOES THE FUTURE HOLD FOR DISTRIBUTION SYSTEM REGULATIONS? - 0.067 - DW
AWWA - UV DISINFECTION OPERATIONAL AND MONITORING PROGRAM AT POMWTP - 0.067 - DW-WW
AWWA - WHATS ON THE HORIZON FOR STAGE 2? - 0.067 - DW
AWWA - EVALUATING BULK HYPOCHLORITE VERSES HYPOCHLORITE GENERATED ON SITE FOR ECONOMICAL AND GREEN DISINFECTION TECHNOLOGIES - 0.067 - DW-WW
AWWA - CASE STUDY: OPERATIONAL ENHANCEMENTS RESULTING FROM THE DEVELOPMENT AND IMPLEMENTATION OF A CONTAMINATION WARNING SYSTEM FOR GLENDALE, ARIZONA - 0.067 - DW
AWWA - CHEMICAL SAFETY TRAINING - 0.067 - DW-WW
AWWA - SAFETY IN EXCAVATION - 0.067 - DW-WW
AWWA - PREVENTING GLOBAL BOREDOM OR HOW TO OVERCOME JOB BOREDOM AND BURNOUT - 0.067 - DW-WW
AWWA - PCPS AND THEIR IMPACT ON WATER AND WASTEWATER - 0.067 - DW-WW
AWWA - HOW TO GET FUNDING FOR YOUR WATER SYSTEM IMPROVEMENTS PROJECT - 0.067 - DW-WW
AWWA - ENGINEERING TECHNOLOGY FOR PIPELINE INFRASTRUCTURE CONDITION ASSESSMENT - 0.067 - DW-WW
AWWA - MANAGING THE IMPACTS OF CONSERVATION AND FISCAL CONSTAINTS TO ENSURE THE FINANCIAL HEALTH OF YOUR UTILITY - 0.067 - DW-WW
AWWA - PHARMACEUTICALS ANALYSIS IN DRINKING WATERS - ARE WE EVEN CLOSE TO "STANDARD METHODS?" - 0.067 - DW-WW
AWWA - SPECIAL CHALLENGES & CONSTRAINTS - 20 MG STORAGE RESERVOIR AT UTAH VALLEY WTP - 0.067 - DW
AWWA - DESIGN AND TROUBLESHOOTING SERIAL/ETHERNET/IP WIRELESS SCADA SYSTEMS - 0.067 - DW-WW
AWWA - UTAH LAKE MASTER PLAN PROJECT - 0.067 - DW-WW
AWWA - CLIMATE CHANGE AND THE CENTRAL UTAH PROJECT - 0.067 - DW
AWWA - POMWTP STARTUP: PLAN, PLAN MORE, THEN HUG MURPHY WHEN HE ARRIVES - 0.067 - DW-WW
AWWA - USE OF SOPHISTICATED NUMERICAL ANALYSES TO IMPROVE SEISMIC RELIABILITY OF A MAJOR WATER SYSTEM - 0.067 - DW
AWWA -PERFORMANCE OF WATER SUPPLY OPERATIONS MEASURED BY RELIABILITY AND MARGINAL COST - 0.067 - DW
AWWA - THRUST RESTRAINT DESIGN FOR DUCTILE IRON PIPE - 0.067 - DW
AWWA - DESIGN OF DUCTILE IRON PIPE ON SUPPORTS - 0.067 – DW
AWWA - JOINTS AND FITTINGS FOR DUCTILE IRON PIPE - 0.067 - DW
AWWA - MAPLETON SPRINGVILLE CANAL ENCLOSURE; DESIGN, CONSTRUCTION, AND OPERATION ISSUES - 0.067 - DW
AWWA - MASTER PLAN COST ESTIMATING: THE PRICE IS RIGHT? OR ARE YOU ON THE WHEEL OF FORTUNE? - 0.067 - DW-WW
AWWA - BENEFITS OF INCORPORATING PLANNING AND ASSET MANAGEMENT TO A DESIGN PROJECT - 0.067 - DW-WW
AWWA - IS YOUR WATER SYSTEM ON SHAKY GROUND? THE CUWCD PLANNING SOLUTION - 0.067 - DW
AWWA - UTAH COUNTYS BEST KEPT SECRET JUST GOT BETTER - ELK RIDGE CITY INCREASES CAPACITY OF THEIR CULINARY WATER SYSTEM - 0.067 - DW
AWWA - INNOVATIVE METHODS TO ENCOURAGE WATER CONSERVATION OR "WHY SHOULD I CONSERVE?" - 0.067 - DW
AWWA - GHG EMISSION INVENTORY AND MANAGEMENT STRATEGY GUIDANCE FOR WATER UTILITIES - 0.067 - DW
AWWA - RECENT ADVANCES IN DROUGHT PLANNING - 0.067 - DW
AWWA - COST SAVINGS USING PERISTALTIC METERING AND ABRASIVES PUMPS - 0.067 - DW-WW
AWWA - HIGH PERFORMANCE PR4710 FOR WATER DISTRIBUTION AND TRANSMISSION - 0.067 - DW
AWWA - TOC/DPB PRECURSOR REMOVAL USING GAC OR ION EXCHANGE - 0.067 - DW
AWWA - PIPELINE INSTALLATION AND MAINTENANCE - 0.067 - DW-WW
AWWA - ARSENIC AND PERCHLORATE REMOVAL USING EDR MEMBRANE SYSTEM WITH BIOLOGICAL TREATMENT OF CONCENTRATE STREAM AT MAGNAS BARTON WELLFIELD WTP - 0.067 - DW
AWWA - UV: DISINFECTION FOR THE FUTURE!! NOW SHOWING AT YOUR LOCAL WTP - 0.067 - DW-WW
IDAHO NATIONAL LABORATORY
LOCKOUT AND TAGOUT - 0.8 - DW-WW
CROSS CONTROL CONNECTION - 0.6 - DW-BAT
MEDIC FIRST AID - 0.8 - DW-WW
RESPIRATOR TRAINING - 0.4 - DW-WW
CONFINED SPACE - 0.4 - DW-WW
HAZWOPER (HAZARDOUS MATERIALS) - 0.8 - DW-WW
IDAHO RURAL WATER ASSOCIATION
LOCATING BURIED UTILITIES – 0.8 – DW-WW
APPLICATIONS
Approved for Licensure
ASPEYTIA ARMANDO DWD1-16448
BALLING JOHN WWC1-16427
BARTLETT RANDY W DWT1-16399
BODNAR JAMES A DWT1-16437
BUYS DOUGLAS RAY WWC1-16549
BUYS DOUGLAS RAY WWT1-16548
CALLAGHAN CALEB RAY DWD1-16442
CAREY JOSEPH LYNN WWT1-16576
ERICKSON JAMES DAVID WWC1-16466
FELTON JARED JENNINGS DWD1-16559
GILBERT TOM A WWC1-16402
GROSS CHARLES DWT1-16587
GRUSSLING ROBIN BAT-16406
HOLDSCLAW SHAWN DWD1-16561
JOHNSON SAM DAVID DWD3-16354
JOHNSON SAM DAVID DWT1-16355
KORTHALS MARK DOUGLAS DWD1-16411
KOSANKE DEREK BAT-16424
LOOP CHRISTOPHER EUGENE WWC1-16588
MORRIS BRENDA LEE WWT1-16412
MORRIS LAWRENCE MICHAEL DWD1-16409
MORRIS LAWRENCE MICHAEL WWC1-16410
MUMMERT MICKEY D WWT1-16528
NAJERA ARTURO CANDELARIO DWD1-16560
RANDOLPH DAVID SCOTT DWT4-16418
RANDOLPH DAVID SCOTT WWT2-16417
RIGBY STEVEN LEE WWC1-16414
RITCH GERALD C WWT1-16580
SEWARD CHRIS WWC1-16585
SMITH LORI LEE WWT4-16397
VAN KIRK ROBERT CRAIG DWT1-16578
VANDERHOOF CHRIS D BAT-16385
WEISHAAR GEOFFREY SCOTT WWC1-16440
Approved for Exam
AGUILAR DELORIS A WWT1
AMBRIZ JOSE LUIS WWT1
ANDERSON ROBERT L WWC2
ARGELAN FRED WWC2
BALER ZANE M DWDOIT
BALIS MARVIN COLE DWD2
BELCHER JOSEPH L DWT4
BEQUEATH CODY WAYNE DWD1
BERGSTROM DOUG D DWD2
BILLETT SEAN MICHAEL DWD1
BLICKFELDT JERRY LYNN WWC2
BLOXHAM JUSTIN D WWT1
BROWN M DAVID DWD1
BUCK SUSIE H WWT1
BUTIGAN SCOTT DOUGLAS WWT1
BYBEE CHARLES L WWC3
CANOY PHILLIP WARREN DWDOIT
CHIVERS TIMOTHY G BAT
CHRISTENSEN NICKOLAS TOD DWDVSWS
COLEMAN KENNETH BEN DWDOIT
CREVISTON GREGORY S WWC3
CROSLAND JAMES ALLEN WWC1
DANES JACOB BAT
DAVIS SCOTT DWDOIT
DAWSON ALEXANDER NICHOLAS WWTOIT
DE LOS REYES MANUEL J DWD1
DELANEY JOHNNY LYNN WWTOIT
DIBBLE REESE F DWD3
DIEHL LEVI DWD2
DUNCAN LARRY LEE WWC1
DUNN MARSHALL JAMES WWT2
EASTMAN LUKE A WWT2
EDDINGS JOSEPH JAMES DWDOIT
EVANS BRUCE K DWT2
FAULKNER DAVID CHARLES WWC1
FAULKNER DAVID CHARLES WWTL
FEARHELLER MARILEE ANN WWT1
FENSKE CHRISTINA MARIE WWC2
FINEGAN-KELLY JANET M WWL4
FISHER RONALD RAY WWC1
FISHER RONALD RAY WWTL
FLORES GILBERT G WWC2
FOLEY GREGORY C DWD3
FRANK JEFFERY W DWD2
FRITZSCHE JAMES R DWT1
GARRETT GAYLEN WWTLA
GOURLEY TRAVIS SCOTT WWT1
GRANT MICHAEL RAY DWD1
GRIFFITH CARL JOSEPH WWTOIT
HALL AMBER E WWT3
HARRISON ERIC A BAT
HARTMAN JESSE J WWT3
HASSELSTROM SCOTT J WWCOIT
HEIDT JOSEPH A WWT3
HENRY JD DWD2
HILLS MICHAEL RAY DWTOIT
HOSKINS PAT J DWD3
HOWE DUSTIN MICHAEL WWTOIT
HUTTEN NEIL C DWD1
JARVIS LUPE M WWL2
JOHNSON SAM DAVID WWCOIT
JOHNSON JOHN MICHAEL WWC2
JOHNSON JOSHUA BAT
JONES PAUL DRAKE WWCOIT
JORDE RONALD MICHAEL WWT1
JOYCE DAVID C WWT4
KERN DANNY WWCOIT
KOSKI ANGIE WWL1
KOSSOW CHRIS D DWT1
KUNTZ KERWIN R DWT2
LAIRD BRETT A WWT1
LANDALUCE SABIN WWC2
LANGFORD JASON A DWT1
LANGLEY JEREMY J WWTLA
LARSEN HOWARD JOSEPH WWTOIT
LEONARD THEODORE ANDREW DWD2
LEWIS ERNIE LYNN DWDOIT
LOWE DAVID LESLIE WWT2
LOWRY SHANE W WWTLA
MACCONNEL MICHAEL JEFFREY WWTLA
MANSFIELD LARRY S WWT4
MARTINEZ ARMANDO RAUL WWL2
MATNEY WILLIAM D WWC1
MAYNE WILLIAM JOSHUA DWD2
MCBURNEY TED LEE WWTOIT
MCBURNEY TED LEE WWCOIT
MCMAHON RODNEY RAY DWT1
MENDIVE TERRELL NICHOLAS DWDOIT
MESSIER DANIEL JAMES WWC2
MESSIER DANIEL JAMES DWD1
MILLER PAUL A WWL4
MILLER ROBERT OSCAR WWC1
MITTELSTEDT DEBORAH F WWT3
MOORE JAMES PAUL WWCOIT
MOORE JAMES PAUL WWTOIT
MOULTON ELAINE WWT1
MUMMERT MICKEY D WWTLA
MUNSON KIM EUGENE WWT1
MURILLO MICHAEL WAYNE DWD2
NEWMAN JUDY C DWDVSWS
NUNEZ ARTURO DWD1
PACKARD KELLY WWTOIT
PAGE CHARLES R DWD2
PERRY DONALD M WWTOIT
PESIKAN MATTHEW D DWD2
PETERSON ADAM JUDD DWD1
PETTIBONE MARVIN JACK DWDVSWS
PHAM DUOC V WWT3
PINA ISIDRO WWC2
POELSTRA GARRETT A DWT2
RENFRO BRAD DWD2
RICE LYNDON P DWT4
RICHARDS DAVID P DWD4
RICHERSON STEVEN ALLEN DWDVSWS
RICHERSON STEVEN ALLEN WWC1
RUCKER STACEY L BAT
RUNYON CHRISTINA M WWCOIT
RYAN PATRICK JOHN DWDVSWS
SAVAGE JAMES LEE WWT1
SCHMELZER MARCIA A WWL4
SCHMILLEN ROBERT MATTHEW WWT2
SCHROEDER JEFFERY DEAN WWT2
SEWARD CHRIS WWT1
SMITH LEONARD LEE WWC2
STEPP LEON CLIFFORD DWDOIT
STEPP LEON CLIFFORD DWTOIT
STEPP LEON CLIFFORD WWTOIT
STEPP LEON CLIFFORD WWCOIT
STOCK WILLIAM D WWTOIT
STONE JAMES B WWC3
STONE KEVIN ALLAN DWD1
STREET GLEN ANDREW DWD2
STUART STACY L DWD1
TEAL MARY L WWT3
TURNER RICK EVAN DWD2
VAN KIRK ROBERT CRAIG WWTOIT
VAUGHN TROY DWTOIT
VERT JEFFERY T WWTLA
WAROFKA JOHN B DWDVSWS
WEISHAAR GEOFFREY SCOTT DWDOIT
WELLS GINGER LYNN DWDOIT
WESTBURG CHRISTOPHER A DWD1
WHITE BRAD J DWD3
WHITE JEFFERY WWC1
WICKHAM BRENDA D WWL3
WILKERSON TIM D DWD2
WILLIAMS JAMES BAT
WILLIAMS BRIAN A WWT4
WILLIE KELLY D WWTLA
WILSON RONALD L DWD2
WILSON JOHN CHARLES DWDOIT
WILT JR CARLTON JOSEPH WWL1
WOOD CHRISTOPHER DAVID DWT2
WOODARD BRIAN IRLE WWT2
WOODLAND KYLE W WWT3
WORLEY CHAD BYRON WWT1
ZWIEBEL MICHAEL L WWT2
Denied
ARMSTRONG COLBY JAMES
ASKEW JAMES MICHAEL
BRIAND JOHN FRANCIS
JOHNS PHILIP NOEL
ROMINE DARRELL
TARIO MARIAN ROSE
Pending
VAUGHN TROY
A motion was made by Mr. Annen to adjourn the meeting at 3:50 pm. Seconded by Mr. Keady, motion carried.
The next meeting will be scheduled after the public hearing date has been determined.